A tracker is only as useful as the trail behind it.

This library contains the records used to support the Southaven tracker’s dates, counts, capacity figures, and contextual claims. Primary does not mean neutral: it means the source is the organization responsible for the record or statement.

“Accessed” is the date Compute Grid Watch last reviewed the linked page. Links open on the publisher’s site and may change after our review.

Complete index

SourceTypePublishedAccessed
Greater Memphis Area Site Updates ↗
SpaceXAI
Company statement Primary 2026-07-30 2026-08-11
Environmental compliance and permit record for the Southaven facility ↗
Mississippi Department of Environmental Quality
Regulatory record Primary 2026-03 2026-08-11
SpaceXAI says it will remove all 69 of its unpermitted turbine power generators ↗
Tom’s Hardware
Technology reporting 2026-08-02 2026-08-11
SpaceX won’t remove all of xAI’s unpermitted turbines for another year ↗
TechCrunch
Industry reporting 2026-07-31 2026-08-11
SpaceXAI to remove 69 temporary turbines at Southaven facility by 2027 ↗
WREG
Local reporting 2026-07-30 2026-08-11
Musk’s AI power plant generates sound and fury in Mississippi ↗
NBC News
National reporting 2026-02-26 2026-08-11

How to cite this tracker

Use the underlying primary or reporting source for the factual claim whenever possible. If you cite Compute Grid Watch’s organization of the material, include the tracker title and its last-verified date.

Suggested citation

Compute Grid Watch, “Southaven temporary turbine removal,” last verified August 11, 2026, aipowertracker.site/trackers/spacexai-southaven-turbine-removal/.